SB1 Case Study: Urban Cooling Strategies for Los Angeles Neighborhoods Serviced by the Orange Line

Source

Authors

City of Los Angeles

Published

2021

Description

This project focused on a study area within a 10-minute walk (half-mile) from the Sherman Way Station Orange Line Metro Station in Canoga Park, exploring conceptual designs to simultaneously mitigate extreme heat (“Urban Cooling”) and improve transit access (“First/Last Mile”).

Climate Impact Tags

Extreme heat Temperature

Adaptation Planning Guide Phases

Phase 2: Assess Vulnerability Phase 3: Define Adaptation Framework and Strategies

Resource Type Tags

ICARP Case Study

Topics

Extent: Los Angeles County

1075 Views

Last updated: April 19, 2024